Regular inspection and maintenance of pipeline is the main means to prevent major accidents and ensure pipeline safety. In this artical, the geological landform of the pipeline is mainly hilly area, and the soil is mainly sand and gravel soil. The pipeline is laid along the expressway, and the surrounding traffic is convenient. We used caliper and MFL inspection for Φ813 pipeline. The following picture shows the scene of pig receive: | ![]() |
![]() | Because there is a dirt pool in the front end of the pig receiver, which hinders the space of our electric pig collecting vehicle, and the sewage pool cannot be removed due to limited conditions. Therefore, we adopt a flexible and feasible operation mode and use tripod to collect the pig. One end of the tripod is fixed on the ground by a fixed pulley, and the other end is hooked to the front end of the detector. With the help of a chain block, it is slowly pulled out. Finally, the process of collecting the pig is successfully completed, and the detection operation is successfully completed. |